Heavy Duty Concrete Hoppers are designed to collect larger amounts of concrete and direct the flow of concrete into the forming setup.

Features
  • Made from industrial grade polyethylene for high strength and durability.
  • The steel reinforced ring underneath the top edge provides added strength and rigidity for improved performance.
  • Discharge options at 8” or 12” depending on desired flow rate.
  • Used with pvc elephant trunk and/or pvc tremie pipe to help direct the concrete flow.
Size Discharge Weight
36" x 36" 8" - 12" 26 lbs.